9:41
BuildCentre
PRECISION ON
SITE.
Instant NZS3604 compliance for the modern builder.
Standard NZS3604:2011 Certified
BUILD CENTRE
DK
Active Jobs
Field Operations Dashboard
Coastal Zone A · Live Feed
Harbor View Apts
Pier 12 · Waterfront
Karori · Wgtn · V.High
Beauchamp Build
47 Beauchamp St
Mt Eden · Medium
Disraeli Garage
8 Disraeli St · Auckland
SPEC DATA
Spec
Data
Oak Ridge Estate · Sector 7-B
Auto-context Active
AI uses this spec data for every question about this job.
Site Conditions · NZS 3604 §4
Wind Zone
Earthquake Zone (NZS 1170.5)
Exposure Zone (corrosion · §4.2.4)
Snow Zone
Soil Class (foundations)
Building Dimensions
Number of Storeys
Max Stud Height (m)
Building Length (m)
Building Width (m)
Structure & Materials
Floor Type
Cladding Type
Roof Type
Roof Pitch (°)
Truss / Rafter Spacing (mm)
Current AI Context · Live
FIXINGS
DK
Fixings
Oak Ridge Estate · Sector 7-B
Job Context · Auto-applied EDIT →
WindHigh RoofLight EQZ2 Studs3.0m FloorSlab
Suggested · Most asked in High Wind
CAT-01 Foundations & Subfloor
NZS 3604 · §6 Open Calculator →
CAT-02 Floor Framing
NZS 3604 · §7 Open Calculator →
CAT-03 Wall Framing
NZS 3604 · §8 Open Calculator →
CAT-04 Openings & Lintels
NZS 3604 · §8.6 Open Calculator →
CAT-05 Roof Framing
NZS 3604 · §10 Open Calculator →
CAT-06 Bracing Systems
NZS 3604 · §5 Open Calculator →
BUILD CENTRE
DK
System Status · Oak Ridge Estate
Compliance Context: Active
Live
WindHigh RoofLight EQZ2 Studs3.0m FloorSlab
What are the specific fixing requirements for a 2/290×45 SG8 Lintel spanning 2.4 m in a high wind zone?
14:02 · Field Inspector
Compliance Report
SG8 Timber Specification

For a 2/290×45 SG8 Lintel, the following structural requirements apply under NZS3604:2011 standards.

01
Lamination
Nails: 90×3.15 mm at 300 mm centres from both sides.
02
Bearing
Minimum 70 mm bearing onto trimmer studs at each end.
03
Fixing Type
High Wind: 2× 4.7kN 'Type E' strap fixings (6× 35 mm × 3.15 mm nails per strap).
Critical · Verify Strap Tension
Verify strap tension before closing in. Over-tightening can cause timber splitting in SG8 grades.
Lintel Requirements
BUILD CENTRE
Inspection ID: #8821-XP 14:08
Lintel
Fixings
Oak Ridge Estate · Sector 7-B
Verified
NZS 3604 · Clause 8.6.1 · Passed
Spacing
150mm
Centre-to-centre
Tolerance
±5mm
Strict adherence
Critical Compliance Note
Verify moisture content < 18% prior to fixing as per NZS 3604 Section 8. Failure to comply voids structural integrity guarantee.
Certified Supply
Industry Standard

Mitek Lintel Bolt

ITM Supplies 1.2 km near
NZS 3604 Compliant
Mechanical Anchor
System Confidence Index 98%
BUILD CENTRE
Critical Fix SKU · MTK-BPA-12

Mitek Bottom
Plate Anchor

Heavy-duty structural connection engineered for critical framing loads and seismic compliance.

Technical Specs
FinishHot Dip Galvanized
DimensionsM12 × 150 mm
ComplianceNZS 3604:2011
ITM
ITM Auckland
2.5 km away · Open until 5pm
$18.45
Per unit · inc GST
M12 Washers
Galvanised structural square
$0.85
20kg
Non-Shrink Grout
High strength 20 kg bag
$42.00
Impact Wrench
18V high torque · rental
$65.00
BUILD CENTRE
DK
Timber
Fixings NZS 3604:2011
Structural connection database for NZ residential timber framing.
CAT-01 Foundations & Subfloor
NZS 3604 · §6 Open Calculator →
CAT-02 Floor Framing
NZS 3604 · §7 Open Calculator →
CAT-03 Wall Framing
NZS 3604 · §8 Open Calculator →
CAT-04 Openings & Lintels
NZS 3604 · §8.6 Open Calculator →
CAT-05 Roof Framing
NZS 3604 · §10 Open Calculator →
CAT-06 Bracing Systems
NZS 3604 · §5 Open Calculator →
Fastening Schedules
Quick Reference
Universal reference for nail sizes, screw gauges, and bolt depths (Sec 2.4).
Nails
Screws
Bolts
Exposure Zone D Tip
Use stainless steel (Grade 304/316) within 500 m of high water mark.
WALL FRAMING PRO
Wall Framing
Lookup
Site: Sector 7G · Industrial Specification
Site Variables
Wind Zone
Stud Height (m)
Stud Spacing (mm)
Load Type
Stud-to-Plate · §8.5.1.2
Top Plate Laps · §8.7.2
Wall Intersections · §8.7.4
Tie-downs · §8.7.5
Site Compliance Log 65% Verified
FOUNDATIONS PRO
Foundations
Lookup
Site: Sector 7-B · Subfloor Specification
Site Variables
Pile Type
Pile Spacing (m)
Bearer Size (mm)
Joist Spacing (mm)
Wind Zone
Bearer to Pile · §6.4
Joist to Bearer · §6.7
Sub-floor Bracing · §6.10
Bottom Plate to Floor · §6.11
Subfloor Compliance Log 42% Verified
FLOOR FRAMING PRO
Floor Framing
Lookup
Site: Sector 7-B · Floor Specification
Site Variables
Joist Size (mm)
Joist Span (m)
Joist Spacing (mm)
Storey
Load Type
Joist Trimming · §7.1
Blocking & Nogs · §7.2
Floor Diaphragm · §7.3
Strutting & Bridging · §7.4
Floor Compliance Log 71% Verified
OPENINGS PRO
Openings
Lookup
Site: Sector 7-B · Lintel Specification
Site Variables
Opening Type
Opening Width (m)
Lintel Type
Roof Load Width (m)
Wind Zone
Lintel Sizing · §8.6.1
Trimming Studs · §8.5.6
Lintel Tie-downs · §8.7.5
Sill Trimmers · §8.5.7
Openings Compliance Log 88% Verified
ROOF FRAMING PRO
Roof Framing
Lookup
Site: Sector 7-B · Roof Specification
Site Variables
Roof Type
Roof Pitch (°)
Roof Span (m)
Truss / Rafter Spacing (mm)
Wind Zone
Truss to Top Plate · §10.4.1.6
Rafter Cyclone Ties · §10.4.2
Purlin Fixings · §10.5
Ridge Connections · §10.6
Roof Compliance Log 23% Verified
BRACING PRO
Bracing
Lookup
Site: Sector 7-B · Bracing Demand
Site Variables
Building Length (m)
Storeys
Earthquake Zone
Wind Zone
Wall Lining
Bracing Demand · §5.2
Wall Bracing Units · §5.4
Diagonal Bracing · §5.5
Sheet Bracing · §5.6
Bracing Compliance Log 54% Verified
BUILD CENTRE
DK
Tools
Site Calculators · Quick Maths
TOOL-01
Triangle Solver
Sides + Angles
TOOL-02
Stair Calculator
NZBC G3 · Rise & Run
SOON TOOL-03
Roof Pitch
Pitch · Rise · Run
SOON TOOL-04
Concrete Volume
m³ + Bag Count
SOON TOOL-05
Rafter Length
Common · Hip · Jack
SOON TOOL-06
Unit Converter
mm · cm · m · in · ft
Field-Tested Tools
Each tool runs offline on your device. Results are advisory — verify against engineering plans before fabrication.
TRIANGLE SOLVER
Triangle
Solver
Solve any triangle from 3 known values
A B C c a b
Enter at least 3 values, including at least 1 side. Angles in degrees. Lowercase = sides, uppercase = opposite angles.
Sides
a
b
c
Angles (degrees)
A
°
B
°
C
°
Solved
Angle A
Angle B
Angle C
Area
Perimeter
STAIR CALCULATOR
Stair
Calculator
NZBC G3 · Rise · Run · Stringer
α RUN RISE STRINGER
NZBC G3.3.2 (residential): rise 150–190 mm, going 240–355 mm, max pitch 37°.
Inputs
Total Rise
mm
Total Run
mm
Number of Risers
risers
Calculated
Number of Treads
2R + G Check
NZBC G3.3.2
Within compliant range.
SITE-OPS
DK
Site
Operations
Oak Ridge Estate · Order & Track
Active on Site
3 orders · Next: Skip swap Thu 8 am
OPS-01
Skip Bin
4 · 6 · 9 m³
ACTIVE
OPS-02
Portaloo
Standard · Disabled
ACTIVE
OPS-03
BCA Inspection
Foundation · Pre-line · Final
OPS-04
Equipment Hire
Scaffolding · Plant
ACTIVE
Skip · 9 m³ General
Hirepool · Swap Thu 8 am · Bay 3
#SK-2847
Portaloo · Standard
Hireace · Weekly service Mon
#PL-1182
Scaffolding · 12 m run
Layher · Off-hire 19 Jun
#SF-0931
OPS-05
Material Drops
Timber · GIB · Fixings
OPS-06
Subbie Coord.
Electrician · Plumber
OPS-07
Toolbox Talks
H&S log
OPS-08
Site Reports
Daily log · Photos
SKIP BIN
Skip Bin
Oak Ridge Estate · 12 Garnet Rd
Skip Size
Waste Type
Drop & Pick-up
Drop Off
Tomorrow · 7 am
Bay 3 · 12 Garnet Rd
Pick Up
Thu 8 am · Swap
4-day hire · full swap-out
Supplier · Nearest First
Waste Management
3.1 km·Next day
$340
INC GST · 4 DAY
EnviroWaste
5.4 km·Next day
$365
INC GST · 4 DAY
Hirepool Skips
6.2 km·Next day
$325
INC GST · 4 DAY
Total
9 m³ · General · 4 day
$340.00
PORTALOO
DK
Portaloo
Oak Ridge Estate · Order & Service
Unit Type
Service Frequency
Supplier
Hireace
4.0 km·Next day
$95
PER WEEK
Portaloos NZ
6.8 km·2-day lead
$110
PER WEEK
Weekly hire
Standard · Weekly service
$95/wk
BCA INSPECTION
DK
BCA
Inspection
Oak Ridge Estate · Auckland Council
Inspection Stage
Preferred Window
Window
Wed 28 May · 9 am – 11 am
Approx. 45 min on site
Council
Auckland Council
BCA-200912·3 day lead
$310
INSPECTION FEE
Compliance Records Auto-Attached
7 saved fixing results from this job will be sent with the booking — inspector can review pre-arrival.
Inspection
Pre-line · 1 visit
$310.00
EQUIPMENT HIRE
DK
Equipment
Hire
Oak Ridge Estate · Plant & Access
Category
Run Length
Hire Period
Period
26 May → 19 Jun · 24 days
Includes erect + dismantle
Supplier
Layher Scaffolding
5.8 km·Includes labour
$1,840
24-DAY HIRE
Hirepool Access
6.2 km·You erect
$1,260
24-DAY HIRE
Kennards Hire
4.4 km·You erect
$1,320
24-DAY HIRE
Total hire
12 m run · 24 days · with labour
$1,840.00
BUILD CENTRE
DK
History
23 Saved Compliance Outputs
Lintel Tie-Down · 2/290×45 SG8
14:08 · TODAY
High · §8.6.1 Oak Ridge
Bottom Plate Anchors · M12 @600
11:42 · TODAY
High · §6.11.4 Oak Ridge
Bracing Units · Single Storey
YESTERDAY
V.High · §5.4 Beauchamp
Roof Truss Cyclone Tie
YESTERDAY
V.High · §10.4.1.6 Beauchamp
Subfloor Pile Fixing · Concrete
2 DAYS AGO
Medium · §6.4.5 Disraeli
Garage Door Lintel · 4.8 m Span
3 DAYS AGO
Medium · §8.6.1.6 Disraeli
Wall Framing · Stud Spacing
LAST WEEK
High · §8.5.2 Oak Ridge